Typhoon Attack

Download Typhoon Attack PDF/ePub or read online books in Mobi eBooks. Click Download or Read Online button to get Typhoon Attack book now. This website allows unlimited access to, at the time of writing, more than 1.5 million titles, including hundreds of thousands of titles in various foreign languages.
Typhoon Attack

The rocket-firing Typhoon fighter played a pivotal role in the Allies' success in the air and on the ground in World War II, from the Normandy beachhead to the Battle of the Bulge and the final struggle for Germany. In this lively, dramatic account of aerial combat, Norman Franks describes what it was really like to fly at low level and attack trains, ships, and tanks; to fire lethal high-explosive rockets into radar or V-1 sites; or to roll over at 12,000 feet and then roar down into an inferno of flak to dive-bomb an enemy position. --Book Jacket.
Management of the Typhoon project

Author: Great Britain: Parliament: House of Commons: Committee of Public Accounts
language: en
Publisher: The Stationery Office
Release Date: 2011-04-15
This report examines the past decisions taken on the Typhoon fighter aircraft and looks at improvements that the Department can make to its delivery model to get more from industry in terms of reduced costs and better performance in the future. The Department originally planned to buy 232 aircraft. However, in light of changed operational requirements and significant funding constraints arising from the pressures of the defence budget, it is now ordering 160 aircraft and will retire the 53 oldest aircraft by 2019, leaving a long-term fleet of 107 aircraft. Overall, it is costing the Department £20.2 billion, £3.5 billion more than it first expected, to buy a third fewer aircraft. This is equivalent to the purchase cost of each aircraft rising by 75%, from £72 million to £126 million. Problems with the availability of spares mean that Typhoons are not flying the hours required and the Department is forced to cannibalise parts from other aircraft to maximise the number of aircraft available on a given day. As a result, it is not fully training all its pilots. Support costs are budgeted at £13.1 billion, but could be as high as £16.6 billion across the life of the aircraft. The Department has identified potential savings of £3.5 billion to keep support costs within budget. The Department will need to both reduce the cost and increase the timeliness of future collaborative spares and repairs contracts. At present, the contracts do little to incentivise better industry performance and to penalise failure.
Management of the Typhoon project

Author: Great Britain: National Audit Office
language: en
Publisher: The Stationery Office
Release Date: 2011-03-02
Getting full value for money from the significant investment in the Typhoon project will depend on the Ministry of Defence successfully progressing the delivery of multi-role capability so that the aircraft can be deployed when required and affordably. The 2010 Strategic Defence and Security Review underlined how Typhoon is core to the RAF's combat aircraft capability and emphasised the Government's commitment to develop Typhoon into a fully multi-role aircraft which can conduct both air-to-air and ground attack missions. Typhoon already successfully undertakes air defence tasks and so far MOD has committed a total of £564 million to upgrade Typhoon for the ground attack role. However, it is unlikely to become the aircraft of choice for most ground attack missions until 2018. The cost of the Typhoon project has risen substantially. Despite the MOD's now buying 72 fewer aircraft (down from 232 to 160, a reduction of 30 per cent), the forecast development and production cost has risen by 20 per cent to £20.2 billion. This is a 75 per cent increase in the unit cost of each aircraft. The cost of supporting each aircraft has also risen by a third above that originally expected. Key investment decisions were taken on an over-optimistic basis and costs have risen at a rate the MOD did not predict. The objectives of four partner nations on the project are not fully aligned and decision-making is slow. There have also been problems with spares and other support which mean the RAF is not flying Typhoon as much as planned.