Navy Force Structure And Shipbuilding Plans

Download Navy Force Structure And Shipbuilding Plans PDF/ePub or read online books in Mobi eBooks. Click Download or Read Online button to get Navy Force Structure And Shipbuilding Plans book now. This website allows unlimited access to, at the time of writing, more than 1.5 million titles, including hundreds of thousands of titles in various foreign languages.
Navy Force Structure and Shipbuilding Plans

This is a print on demand edition of a hard to find publication. Contents: (1) Introduction; (2) Background: Proposed 313-Ship Fleet; FY 2010 Shipbuilding Request; (3) Oversight Issues for Congress: Adequacy of Proposed 313-Ship Fleet: Adequacy of Shipbuilding Plan for Maintaining 313 Ships; Shortfalls Relative to 313-Ship Goals; Affordability of Shipbuilding Plan; (4) Legislative Activity for FY 2010: FY 2010 Defense Authorization Act; FY 2010 DoD Appropriations Act; Resolution Directing Submission of FY 2010 30-Year Shipbuilding Plan; Legislation on Individual Shipbuilding Programs. Appendixes: (A) December 2009 Press Reports About Draft FY 2011 30-Year Shipbuilding Plan; (B) Adequacy of Planned 313-Ship Fleet; (C) Size of the Navy and Navy Shipbuilding Rate. Charts and tables.
Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

In February 2008, as part of its proposed FY2009 budget, the Navy submitted to Congress the FY2009 version of its annual 30-year shipbuilding plan. The 30-year plan is intended to support the Navy's goal of achieving and maintaining a 313-ship fleet. The Navy first presented the 313-ship plan to Congress in February 2006. The increase in the Navy's estimated cost for implementing the plan is so large that the Navy no longer appears to have a clearly identifiable, announced strategy for generating the funds needed to implement the 30-year plan, at least not without significantly reducing funding for other Navy programs or increasing the Navy's programmed budget in coming years by billions of dollars per year. Concerns about the Navy's prospective ability to afford the 30-year shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to strong concerns among some Members about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. As a consequence of these strong concerns, some Members in hearings this year on the Navy's proposed FY2009 budget have strongly criticized aspects of the Navy's shipbuilding plan and indicated that they are considering making changes to the plan. Some Members in the House, for example, have indicated that they are considering the option of not procuring a third DDG-1000 class destroyer in FY2009, as the Navy has requested, and using the funding programmed for that ship to instead procure other kinds of ships for the Navy. This report will be updated as events warrant.
Navy Force Structure and Shipbuilding Plans

The Navy's proposed FY2014 budget requests funding for the procurement of 8 new battle force ships (i.e., ships that count against the Navy's goal for achieving and maintaining a fleet of 306 ships). The 8 ships include two Virginia-class attack submarines, one DDG-51 class Aegis destroyer, four Littoral Combat Ships (LCSs), and one Mobile Landing Platform/Afloat Forward Staging Base (MLP/AFSB) ship. The Navy's proposed FY2014-FY2018 five-year shipbuilding plan includes a total of 41 ships-the same number as in the Navy's FY213-FY2017 five-year shipbuilding plan, and one less than the 42 ships that the Navy planned for FY2014-FY2018 under the FY2013 budget submission.