Evaluation Of Temporary Ramp Metering For Work Zones


Download Evaluation Of Temporary Ramp Metering For Work Zones PDF/ePub or read online books in Mobi eBooks. Click Download or Read Online button to get Evaluation Of Temporary Ramp Metering For Work Zones book now. This website allows unlimited access to, at the time of writing, more than 1.5 million titles, including hundreds of thousands of titles in various foreign languages.

Download

Evaluation of Temporary Ramp Metering for Work Zone Safety


Evaluation of Temporary Ramp Metering for Work Zone Safety

Author: Zhongyuan Zhu

language: en

Publisher:

Release Date: 2012


DOWNLOAD





Ramp metering has been successfully implemented in many states and studies have documented its positive mobility and safety benefits. However, there have been no studies on the use of ramp metering for work zones. This thesis reports the results from the first deployment of temporary ramp meters in work zones in the United States. Temporary ramp meters were deployed at seven work zones in Missouri. Due to lack of crash data, this study uses video data to extract alternative safety measures such as driver compliance, merging behavior, speed differentials, lane changing, and braking maneuvers. This evaluation suggests that temporary ramp meters should only be deployed at work zone locations where there is potential for congestion and turned on only during periods of high congestion. In comparison to over 90% compliance rates of permanent ramp meters implemented in other states, field data showed compliance rates from 40.5% to 82.9% in temporary ramp meter. This suggested that non-compliance could be a major safety issue in the deployment of temporary ramp meters. The use of a three-section instead of a traditional two-section signal head used for ramp metering produced significantly higher compliance rates. This thesis then aggregated the data into groups to further analyze the effects of different factors such as platoons, commercial trucks, work zone type and work zone-ramp configuration. After analyzing general characteristics of mainline and ramp vehicle speed and speed differentials, this study then focused on findings for different comparison groups. The two comparison groups are "between two work zones" versus "before work zone" configuration and "left-lane closed" versus "right-lane closed" work zone type. Results indicated lower mean speeds of mainline and ramp vehicles and higher differentials when ramp metering was turned on. This is expected and again temporary ramp meters are recommended only where congestion occurs. Congestion will lead to lower mainline speeds thus lower speed differentials either with or without ramp metering. Finally, analysis of merging headways showed that temporary ramp meters were effective in separating platoons before vehicles merged into mainline. This produces more single-vehicle merging which requires shorter gaps and causes fewer impacts on the mainline traffic.

Evaluation of Temporary Ramp Metering for Work Zones


Evaluation of Temporary Ramp Metering for Work Zones

Author: Praveen Edara

language: en

Publisher:

Release Date: 2012


DOWNLOAD





Ramp metering has been successfully implemented in many states to improve traffic operations on freeways. Studies have documented the positive mobility and safety benefits of ramp metering. However, there have been no studies on the use of ramp metering for work zones. This report documents the results from the first deployment of temporary ramp meters in work zones in the United States. Temporary ramp meters were deployed at seven urban short-term work zones in Missouri. Safety measures such as driver compliance, merging behavior, and speed differentials were extracted from video-based field data. Mobility analysis was conducted using a calibrated simulation model and the total delays were obtained for under capacity, at capacity, and over capacity conditions. This evaluation suggests that temporary ramp meters should only be deployed at work zone locations where there is potential for congestion and turned on only during above-capacity conditions. The compliance analysis showed that non-compliance could be a major safety issue in the deployment of temporary ramp meters for under-capacity conditions. The use of a three-section instead of a traditional two-section signal head used for permanent ramp metering produced significantly higher compliance rates. Ramp metering decreased ramp platoons by increasing the percentage of single-vehicle merges to over 70% from under 50%. The accepted-merge-headway results were not statistically significant even though a slight shift towards longer headways was found with the use of ramp meters. Mobility analysis revealed that ramp metering produced delay savings for both mainline and ramp vehicles for work zones operating above capacity. On average a 24% decrease in total delay (mainline plus ramp) at low truck percentage and a 19% decrease in delay at high truck percentage conditions resulted from ramp metering.

Evaluation of Ramp Meter Effectiveness for Wisconsin Freeways


Evaluation of Ramp Meter Effectiveness for Wisconsin Freeways

Author:

language: en

Publisher:

Release Date: 2004


DOWNLOAD






Recent Search