Critical Path Analysis In Practice Collected Papers On Project Control Edited By Gail Thornley Papers And Reports Presented At Meetings Of The Critical Path Analysis Study Group Of The Operational Research Society

Download Critical Path Analysis In Practice Collected Papers On Project Control Edited By Gail Thornley Papers And Reports Presented At Meetings Of The Critical Path Analysis Study Group Of The Operational Research Society PDF/ePub or read online books in Mobi eBooks. Click Download or Read Online button to get Critical Path Analysis In Practice Collected Papers On Project Control Edited By Gail Thornley Papers And Reports Presented At Meetings Of The Critical Path Analysis Study Group Of The Operational Research Society book now. This website allows unlimited access to, at the time of writing, more than 1.5 million titles, including hundreds of thousands of titles in various foreign languages.
Critical Path Analysis in Practice. Collected Papers on Project Control. Edited by Gail Thornley. (Papers and Reports Presented at Meetings of the Critical Path Analysis Study Group of the Operational Research Society.).

Author: Operational Research Society (LONDON). Critical Path Analysis Study Group
language: en
Publisher:
Release Date: 1968
Critical Path Analysis in Practice

Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences. This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press. Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.