Application Of Accelerated Bridge Construction Connections In Moderate To High Seismic Regions


Download Application Of Accelerated Bridge Construction Connections In Moderate To High Seismic Regions PDF/ePub or read online books in Mobi eBooks. Click Download or Read Online button to get Application Of Accelerated Bridge Construction Connections In Moderate To High Seismic Regions book now. This website allows unlimited access to, at the time of writing, more than 1.5 million titles, including hundreds of thousands of titles in various foreign languages.

Download

Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions


Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions

Author:

language: en

Publisher: Transportation Research Board

Release Date: 2011


DOWNLOAD





TRB’s National Cooperative Highway Research Program (NCHRP) Report 698: Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions evaluates the performance of connection details for bridge members in accelerated bridge construction in medium-to-high seismic regions and offers suggestions for further research.

NCHRP Report 698


NCHRP Report 698

Author:

language: en

Publisher:

Release Date: 2011


DOWNLOAD





Accelerated Bridge Construction


Accelerated Bridge Construction

Author: Mohiuddin Ali Khan

language: en

Publisher: Elsevier

Release Date: 2014-08-12


DOWNLOAD





The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated bridge construction (ABC) construction programs in the United States, Europe and Japan. Accelerated Bridge Construction: Best Practices and Techniques provides a wide range of construction techniques, processes and technologies designed to maximize bridge construction or reconstruction operations while minimizing project delays and community disruption. - Describes design methods for accelerated bridge substructure construction; reducing foundation construction time and methods by using pile bents - Explains applications to steel bridges, temporary bridges in place of detours using quick erection and demolition - Covers design-build systems' boon to ABC; development of software; use of fiber reinforced polymer (FRP) - Includes applications to glulam and sawn lumber bridges, precast concrete bridges, precast joints details; use of lightweight aggregate concrete, aluminum and high-performance steel