A Critical Path Problem Using Triangular Neutrosophic Number

Download A Critical Path Problem Using Triangular Neutrosophic Number PDF/ePub or read online books in Mobi eBooks. Click Download or Read Online button to get A Critical Path Problem Using Triangular Neutrosophic Number book now. This website allows unlimited access to, at the time of writing, more than 1.5 million titles, including hundreds of thousands of titles in various foreign languages.
A Critical Path Problem Using Triangular Neutrosophic Number

The Critical Path Method (CPM) is one of several related techniques for planning and managing of complicated projects in real world applications. In many situations, the data obtained for decision makers are only approximate, which gives rise of neutrosophic critical path problem.
A Critical Path Problem Using Triangular Neutrosophic Number

The Critical Path Method (CPM) is one of several related techniques for planning and managing of complicated projects in real world applications. In many situations, the data obtained for decision makers are only approximate, which gives rise of neutrosophic critical path problem.
Neutrosophic Sets and Systems, vol. 63/2024

Author: Florentin Smarandache
language: en
Publisher: Infinite Study
Release Date: 2024-02-01
“Neutrosophic Sets and Systems” has been created for publications on advanced studies in neutrosophy, neutrosophic set, neutrosophic logic, neutrosophic probability, neutrosophic statistics that started in 1995 and their applications in any field, such as the neutrosophic structures developed in algebra, geometry, topology, etc. Neutrosophy is a new branch of philosophy that studies the origin, nature, and scope of neutralities, as well as their interactions with different ideational spectra. This theory considers every notion or idea together with its opposite or negation